Project: Erosion Control
Click on photos to enlarge

Eroded Spillway Repair:

 

Before: Floodwater washed away the rip rap

After: Rock placed back

DSC09520sm

DSC09522sm

Eroded Creek Bank Repair:

 

Before.

After: Rip rap installed to prevent further erosion..

002-151sm

004-133sm

Drain Pipe Repair:

 

Before: Silted in and eroded drain pipe.

After: New pipes and rip rap installed.

001-149sm

007-91sm

 

 

 

 
Guins' Excavating Service - Wendell, NC
www.webdesign4him.com Affordable websites

© Copyright 2009 Marinaro Enterprises
Website designed by www.webdesign4him.com

Click Here for a SPECIAL OFFER and SAVE $100 on website design.

email:  john@guinsexcavating.com