|
Project: Erosion Control |
||
|
Eroded Spillway Repair: |
|
|
|
Before: Floodwater washed away the rip rap |
After: Rock placed back |
|
|
Eroded Creek Bank Repair: |
|
|
|
Before. |
After: Rip rap installed to prevent further erosion.. |
|
|
Drain Pipe Repair: |
|
|
|
Before: Silted in and eroded drain pipe. |
After: New pipes and rip rap installed. |
|
|
|
|
|
|
||

|
|
||
|
© Copyright 2009 Marinaro Enterprises Click Here for a SPECIAL OFFER and SAVE $100 on website design. |
|